Carrer La Sardana, núm. 5 baixos AD500 Andorra la Vella (+376) 80 80 80 info@immobiliariasuperior.com
Apartment for Sale with 4 bedrooms in Escaldes-Engordany with terrace
1.395.000 €
ref12552
4 Bedrooms
3 Bathrooms
182.00 m2
Elegant and spacious flat under construction for sale, in the parish of Escaldes-Engordany, next to the main shopping avenue, with all services and shops within easy reach (shopping centres, schools, bars and restaurants). This spacious, luminous property, with high quality finishes and materials, is the ideal enclave both for investment and to live in the country. This magnificent property is on the first floor and has 182m2 and a terrace of 103m2. Its interior distribution is created to enjoy the whole surface in a unique atmosphere; distributed in an open kitchen in the spacious living-dining room, a laundry room, a suite type bedroom, a suite type bedroom with access to the terrace, a double bedroom with access to the terrace, a single bedroom with access to the terrace and a complete bathroom that complete this fantastic flat. The interior flooring is parquet from the STARWOOD series, model TANZANIA ALMOND 25 x 150cm from the PORCELANOSA GROUP. Factory lacquered MDF skirting board. Or similar. The exterior flooring is parquet from the STARWOOD series, model TANZANIA ALMOND 25 x 150cm, special for exteriors by PORCELANOSA GROUP on balconies. Or similar. The bathroom is made with the best materials and finishes, to offer a perfect combination, both in design and quality. The sanitary ware, taps and furniture are from the PORCELANOSA GROUP or similar. The sanitary ware will be white porcelain. The kitchen furniture is from NOLTE, NEOLITH and is fully equipped with a "BORA" type surface extractor fan or similar, induction hob, electric oven, microwave, fridge and dishwasher from SIEMENS. The heating is underfloor heating and there will be cold air conditioning throughout the property, except for the bathrooms. Optional parking space from 40.000€ and optional storage room from 6.000€. Completion of the works is scheduled for September 2025.